2018 Capital Improvement Projects

Please click here for project locations.

2018 Alley Reconstruction Program

The 2018 Alley Reconstruction Program repairs failed alleys.

Start Date: July 2018
Completion Date: September 2018

Contractor: Schroeder & Schroeder
Project Contact: Jorge Cruz, cruzj@wilmette.com, 847-853-7623


2018 Road Program

The 2018 Road Program resurfaces Village streets that are in poor to fair condition. Curb and gutter and sidewalks are repaired as required and the street is resurfaced in asphalt.

Start Date: April 2018
Completion Date: Complete

Contractor: J. A. Johnson Paving
Project Contact: Jorge Cruz, cruzj@wilmette.com, 847-853-7623


2018 Brick Street Renovation & Repair Program

The 2018 Brick Street Renovation & Repair Program relays one block of brick streets each year. The 2018 program location is Catalpa from Oakwood to Prairie.

Start Date: September 2018
Completion Date: November 2018

Contractor: A. Lamp Concrete Contractors
Project Contact: Jorge Cruz, cruzj@wilmette.com, 847-853-7623


2018 Sewer Repair and Valve Program

The 2018 Sewer Repair and Valve Repair Program completes point repairs,  which is excavating and replacing portions of the sewer system, including addressing defective manholes and sewer service connections as necessary. The Valve Program is for the installation of new valves and the replacement of existing valves on the water distribution system.

Start Date: August 2018
Completion Date: December 2018

Contractor: Lenny Hoffman Excavating
Project Contact: Danielle Horn, hornd@wilmette.com, 847-853-7628


2018 Sidewalk and Curb Program

This is an annual maintenance program to replace damaged sections of sidewalk throughout the Village. The Curb Program is an annual maintenance program to replace non-functional, hazardous, broken and missing curbs throughout the Village.

Phase I: May 2018
Phase II: October 2018

Completion Date: Complete

Contractor: Schroeder & Schroeder
Project Contact: Dan Smith, smithd@wilmette.com, 847-853-7621


2018 Street Patching Program

This is an annual maintenance program to repair locations where water and sewer repairs were needed.

Phase I: July/August 2018
Phase II: November 2018

Completion Date: Complete

Contractor: Chicagoland Paving
Project Contact: Danielle Horn, hornd@wilmette.com, 847-853-7628


Sewer Lining Program – Phase II

The Sewer Lining Program uses cured-in-place pipe (CIPP), a trenchless technology, to rehabilitate sewers by eliminating infiltration, structural defects, and root intrusion. Click here for more information and locations of sewer lining.

Start Date: May 2018
Completion Date: Complete

Contractor: Hoerr Construction
Project Contact: Danielle Horn, hornd@wilmette.com, 847-853-7628


2018 Sewer Cleaning & Televising

This is an annual maintenance program, which involves cleaning and televising approximately 10% of the Villages 146+ miles of sewers.  Routine cleaning is a vital component of maintaining the existing sewer system to its maximum effectiveness. Sewer televising identifies badly deteriorated pipe and sewer pipe that have obstructions caused by mineral deposits or tree root intrusions.

Start Date: July 2018
Completion Date: Complete

Contractor: American Underground
Project Contact: Danielle Horn, hornd@wilmette.com, 847-853-7628


Skokie Boulevard & Hibbard Road Intersection Improvements

This multi-jurisdiction improvement project includes the north leg of Hibbard Road and both legs of Skokie Boulevard which are under the jurisdiction of the Illinois Department of Transportation (IDOT) and the south leg of Hibbard Road which is under Cook County Department of Transportation and Highways (CCDOTH) jurisdiction. The project limits on Hibbard Road are approximately 430 feet south and north of Skokie Boulevard, and 500 feet west and east of Hibbard Road on Skokie Boulevard. The project consists of widening the intersection to provide a left turn channelization along all four legs of the intersection, replacement/modernization of traffic signals to accommodate the proposed channelization, interconnection of the traffic signals with the Lake Avenue and Wilmette Avenue signals along Skokie Boulevard, additional pedestrian signals, updated intersection lighting per IDOT standards and completion of sidewalk to fill in gaps.

The project will be funded through federal Surface Transportation Program, State, County and Village funding.

Start Date: August 2017 
Completion Date:  Complete

Contractor: Berger Excavating Contractors
Project Contact:  Daniel Manis, P.E., Village Engineer, SkokieHibbard@wilmette.com or 847-853-7602.


2018 Crack Sealing Program

Start/End Date: Complete

Contractor:  Patriot Pavement Maintenance
Project Contact: Dan Smith, smithd@wilmette.com, 847-853-7621


2018 Pavement Marking Program

Start/End Date: Complete

Contractor: Precision Pavement Markings
Project Contact: Dan Smith, smithd@wilmette.com, 847-853-7621