Capital Improvement Projects for 2019

Please click here for project locations.


Road Program

The annual Road Program resurfaces Village streets that are in very poor condition with hot-mix asphalt. This program helps maintain the nearly 65 mile network of Village-owned, non-brick ck streets. Curbs, gutters, sidewalks, and utility structures are repaired as required.

Start Date: May 20, 2019
Tentative Completion Date: August 2019

Contractor: Schroeder Asphalt Services, Inc.

Click here to view the Village Board contract award for this project.

Project Contact: Ryan Kearney, P.E., Project Manager, kearneyr@wilmette.com, 847-853-7629


Alley Reconstruction Program

The annual Alley Reconstruction Program replaces alleys that are in very poor condition.  This program helps maintain the Village’s 225 alley system.

Start Date: May 30, 2019
Tentative Completion Date: August 2019

Contractor: DiNatale Construction, Inc.

Click here to view the Village Board contract award for this project.

Project Contact: Ryan Kearney, P.E., Project Manager, kearneyr@wilmette.com, 847-853-7629


Brick Street Reconstruction Program

The annual Brick Street Reconstruction Program relays one block of brick street each year. The 2019 program location is Wood Court, from Oakwood Avenue to Prairie Avenue.

Tentative Start Date: August 2019
Tentative Completion Date: September 20, 2019

Contractor: DiNatale Construction, Inc.

Click here to view the Village Board contract award for this project.

Project Contact: Jorge Cruz, P.E., Assistant Village Engineer, cruzj@wilmette.com, 847-853-7623


Sewer Repair and Valve Installation Programs

The annual Sewer Repair Program completes point repairs on the sewer system, which involves excavating and replacing portions of the sewer system.  Common problems addressed with the program includes severely cracked or collapsed pipe, pipe with large holes and voids, or settled pipe. This project also addresses defective manholes and sewer service connections as necessary.

The annual Valve Installation Program installs new valves and replaces defective existing valves on the water distribution system. The new valves are installed to comply with Village Code 18-1.1.

Tentative Start Date: September 2019
Tentative Completion Date: November 2019

Contractor: TBD

Project Contact: Danielle Horn, P.E., Project Manager, hornd@wilmette.com, 847-853-7628


Sidewalk and Curb Programs

The annual Sidewalk Program replaces damaged sections of sidewalk throughout the Village. The annual Curb Program replaces non-functional, hazardous, broken, and missing curbs throughout the Village.

Phase I: Early May 2019
Tentative Phase II: September 2019

Contractor: Schroeder & Schroeder, Inc.

Click here to view the Village Board contract award for this project.

Project Contact: Dan Smith, P.E. Engineering Assistant, smithd@wilmette.com, 847-853-7621


Brick Street Maintenance Program

The annual Brick Street Maintenance Program involves relaying brick pavers that have settled at various locations.

For the 2019 Brick Street Maintenance Program Zone Map, click here.

Tentative Start Date: August 2019
Tentative Completion Date: September 20, 2019

Contractor: Alamp Concrete Contractors, Inc.

Click here to view the Village Board contract award for this project.

Project Contact: Jorge Cruz, P.E., Assistant Village Engineer, cruzj@wilmette.com, 847-853-7623


Utility Patching Program

The annual Utility Patching Program repairs the pavement at various locations in the Village where water and sewer repairs were done by Public Works.

Phase I: Late May 2019
Tentative Phase II: September 2019

Contractor: DiNatale Construction, Inc.

Project Contact: Dan Smith, P.E., Engineering Assistant, smithd@wilmette.com, 847-853-7621


Street Rejuvenation Program

The annual Street Rejuvenation Program applies a product to recently paved asphalt surfaces in order to restore flexibility lost from oxidation.  This service helps decrease the deterioration rate of the asphalt surface, which reduces/delays the need for patching or crack sealing.

Tentative Start/Completion Date: August 2019

Contractor: Corrective Asphalt Materials, LLC

Project Contact: Ryan Kearney, P.E., Project Manager, kearneyr@wilmette.com, 847-853-7629


Sewer Lining Program – Phases III & IV

The annual Sewer Lining Program uses cured-in-place pipe (CIPP), a trenchless technology, to rehabilitate sewers by eliminating infiltration, structural defects, and root intrusion.

Tentative Start Date: August 2019
Tentative Completion Date: November 2019

Contractor: Insituform Technologies USA, LLC

Project Contact: Danielle Horn, P.E., Project Manager, hornd@wilmette.com, 847-853-7628


Sewer Cleaning & Televising Program

This annual Sewer Cleaning & Televising Program involves cleaning and televising approximately 10% of the Villages 150+ miles of sewers each year.  Routine cleaning is a vital component of maintaining the existing sewer system to its maximum capacity and effectiveness. Sewer televising identifies badly deteriorated pipe and sewer pipe that have obstructions caused by mineral deposits or tree root intrusions.

Start Date: June 10, 2019
Tentative Completion Date: August 2019

Contractor: American Underground, Inc.

Click here to view the Village Board contract award for this project.

Project Contact: Danielle Horn, P.E., Project Manager, hornd@wilmette.com, 847-853-7628


Crack Sealing Program

This program is designed to perform preventative maintenance on recently resurfaced asphalt streets throughout the Village by sealing cracks that have developed. Crack sealing pavement prevents water from entering the base and will extend the life of the pavement.

Tentative Start/Completion Date: October 2019

Contractor:  Patriot Pavement Maintenance, Inc.

Click here to view the Village Board contract award for this project.

Project Contact: Dan Smith, P.E., Engineering Assistant, smithd@wilmette.com, 847-853-7621


Pavement Marking Program

The annual Pavement Marking Program  involves re-striping pavement markings that have faded and worn. The program prioritizes locations in the following order: pedestrian crossings along school walking routes; pavement markings along arterial, collector and residential streets.

Tentative Start/Completion Date: September 2019

Contractor: Precision Pavement Markings, Inc.

Click here to view the Village Board contract award for this project.

Project Contact: Jorge Cruz, P.E., Assistant Village Engineer, cruzj@wilmette.com, 847-853-7623


Water Main Replacement Program

This program consists of replacing water main sections based on age and break history in the Village. The 2019 Program will replace the water main on Lake Avenue, between Skokie Boulevard and Hibbard Road.

Tentative Start Date: October 2019
Tentative Completion Date: June 2020

Contractor: TBD

Project Contact: Ryan Kearney, P.E., Project Manager, kearneyr@wilmette.com, 847-853-7629


Asphalt Pavement Patching Program

The purpose of this program is to help extend the service life of the asphalt pavement surface. The scope of work consists of patching localized areas of pavement deterioration (non-utility) with hot-mix asphalt. This work will occur at various locations throughout the Village

Tentative Start Date: August 2019
Tentative Completion Date: early September 2019

Contractor: Chicagoland Paving Contractors, Inc.

Click here to view the Village Board contract award for this project.

Project Contact: Ryan Kearney, P.E., Project Manager, kearneyr@wilmette.com, 847-853-7629


West Side Neighborhood Storage Project – Phase 1A

This project involves the installation of storm relief sewers in west Wilmette to address neighborhood flooding. This phase includes installation of storm sewers only, subsequent phases will include stormwater storage facilities currently proposed to be constructed underneath three different parks throughout the west side. More information about Phase 1A coming soon.

Tentative Start Date: October 2019
Tentative Completion Date: Spring 2020

Contractor: TBD

Project Contact: Dan Manis, P.E., Village Engineer, manisd@wilmette.com or (847) 853-7602


Locust Road Construction Project

This project involves storm sewer and water main replacement, roadway reconstruction, sidewalk improvements, and intersection and crosswalk safety enhancements on Locust Road between Wilmette and Lake Avenues. Visit www.locustroadconstruction.com for more information.

Start Date: March 11, 2019
Tentative Completion Date: November 2019

Contractor: A. Lamp Concrete Contractors, Inc.

Click here to view the Village Board contract award for this project.

Project Contact: Darren Frawley, P.E., Resident Engineer, dfrawley@bla-inc.com or (630) 660-6180, or Dan Manis, P.E., Village Engineer, manisd@wilmette.com or (847) 853-7602


Glenview Road Bridge North Sidewalk Replacement Project

This project involves the replacement of the sidewalk and parapet wall on the north side of the Glenview Road Bridge over the Edens Expressway.

Tentative Start Date: September 2019
Tentative Completion Date: October 2019

Contractor: TBD

Project Contact: Georgia Mihalopoulos, P.E., Engineering Technician, mihalopoulosg@wilmette.com or (847) 853-7601


 

 